Skip to main content

Factors Affecting Throughput in LTE :-

Factors Affecting Throughput in LTE :- Low mcs, Low sinr, Low rsrq , high prb usage, wrong earfcn Definition, no Carrier aggregation ör missing ca configuration, Pci , Route sequence index collision, Wrong tac planning, gateway security problem, etc. air quality (now sinr, rsrq, etc etc), modulation level. For example, 16QAM, 64QAM, etc. Low Throughput Issue:- 1 - Poor coverage (BLER) 2 - Availability issue 3 - Uplink Interference 4 - A poor RACH decoding SR 5 - High error on S1 link. 6 - Delay on S1 link towards MME & SGW. 7 - Accessibility issue. 8 - Handover failure. 9 - Lack of PRBs. 10 - Problematic UE. 11 - Downlink Interference (Bad CQI) 12 - MIMO Parameters 13 - High VSWR 14 - High radio errors or instability issue. 15 - Maximum number of RRC connections active per cell 16 - Maximum number of users per TTI supported per cell. 17 - Core network, MME/SGW, etc 18 - Transmission instability & bottleneck. 19 - Incorrect parameter setting. 20 - Badly tuned handover parameters
Share/Bookmark

Installation Engineer

Tangent International are urgently looking for a Installation Engineer to work a 2 month extendable contract based in Cameroon (Douala)

Job Responsibilities
Check the BoQ according to solution.
Identify and submit the list of missing materials for ordering
Weekly checking of ZZ report till material delivery in the country
Prepare TSS templates according to SoW
Define project in SDE tool, upload TSS template and sites list
Lead the site supervisors in doing site surveys of the sites planned
Summarize key inputs from TSS reports 
Prepare Site Material Request 
Prepare SID templates
Prepare PAC template
Manage IE team in doing SID for all the sites.
Manage warehouse team in doing materials reception/delivery
Manage ASP/SS in doing site installation
Handle faulty units claims during rollout
Prepare As built/C-Module templates for each technology.
Manage IE team in doing As built/C-Module for the sites completed
 
Responsibilities in supporting warehouse team  
Lead hardware inventory, analyze and advice early starting of rollout before material arrival in the country
Full support to warehouse team in handling and delivering Ericsson materials
Material tracking

Responsibilities in supporting Solution Architect  
Full support to solution architect team by providing network key inputs for BoQ preparation
BoQ draft preparation as per SoW
Review BoQ according to solution and submit the list of missing materials if there is any, for ordering
 
If interested please send me your updated CV to ben.harris@tanint.com

Comments

Popular posts from this blog

Timing Advance With Calculation

check your skills